This model keeps the uniform slab and thickened border separate. Steps, piers, seat walls, curves and grade beams should be calculated as additional shapes.

01 / Formula

How this is calculated

Volume = slab area × thickness + perimeter × border width × extra border depth

02 / Assumptions

What the estimate assumes

  • The patio is rectangular.
  • The border follows the full perimeter.
  • Border depth is entered as additional depth below the main slab.

03 / Worked example

See the math in context

A 20 × 16 ft patio has 320 sq ft of main slab area; a 12-inch-wide perimeter border adds 72 sq ft at the extra depth.

04 / Guidance

Avoid double-counting the border

The main slab calculation already includes its normal thickness beneath the border. Enter only the border’s additional depth.

Questions

Frequently asked

Should I order exactly the calculated amount?+

Usually no. Excavation variation, form dimensions, spillage, and uneven subgrade can increase actual volume. Use the editable waste allowance and discuss minimum loads and order increments with the supplier.

How many cubic feet are in a cubic yard?+

There are exactly 27 cubic feet in one cubic yard. Divide cubic feet by 27 to convert to cubic yards.

Does this replace a structural design?+

No. These tools estimate material quantity only. A qualified professional and applicable plans, codes, site conditions, reinforcement requirements, and manufacturer instructions govern the project.

Sources

Reference sources