A board-and-joist count is not a complete deck list. The approved plan and exact product details should drive member, connector, fastener, flashing, and footing quantities.

01 / Formula

How this is calculated

Complete takeoff = plan callouts + counted assemblies + measured materials + package rounding + labeled allowance

02 / Assumptions

What the estimate assumes

  • An approved design establishes structural sizes and connections.
  • Hardware is matched to member, load, treatment, and exposure.
  • Temporary works, tools, delivery, storage, and disposal are included separately.

03 / Worked example

See the math in context

Count each connection by location—such as joist-to-beam or guard-post-to-frame—then map it to the approved connector and required fasteners.

04 / Guidance

Foundation and frame

List excavation, forms, concrete, anchors, post bases, posts, beams, ledgers or freestanding supports, flashing, joists, rims, blocking, hangers, lateral connections, and approved fasteners.

05 / Guidance

Surface and edges

List field boards, borders, breaker boards, fascia, clips or screws, plugs, stairs, landings, guards, handrails, gates, trim, finish, and repair stock.

06 / Guidance

Jobsite and closeout

Include permits, utility locating, access protection, demolition, disposal, delivery, lifting, temporary bracing, inspection access, cleanup, and maintenance documentation.

Questions

Frequently asked

Are the calculator defaults building-code requirements?+

No. They are editable planning inputs. Verify current local code, approved plans, span tables, product evaluation reports, and manufacturer instructions before construction.

Does the estimate include the complete deck structure?+

Only if every component is explicitly listed. Footings, posts, beams, ledgers, flashing, lateral connections, guards, stairs, hardware, fascia, permits, delivery, and waste often require separate takeoffs.

How should I measure a non-rectangular deck?+

Divide the surface into rectangles and other measurable shapes, calculate each separately, then account for board direction, seams, breaker boards, borders, stairs, and reusable offcuts.